IS WORK OVER?

Automation index

How much of a Glassblower’s job can AI already do?

A stock gather comes earlier. Gathering, blowing without leaving stress in the piece do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Glassblower

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Furnace, pipe and the gather.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Blow, shape and the one that drops.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Anneal, cut and the stresses.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Order, the colour and the one that misses.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The heat, the rhythm and not rushing the anneal.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
No stress, and not leaving it raw.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • gather glass
  • blow
  • pipe
  • anneal
  • stresses
  • glass furnace
  • glass moulds
  • cut the cane

Sources for this job· O*NET 51-9195.00· ESCO/ISCO 7315

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 653Tractor driver19%
  2. 654Stagehand19%
  3. 655Valet19%
  4. 657Stained-glass artist19%
  5. 658Red Cross volunteer19%
  6. 659Cobbler19%