IS WORK OVER?

Automation index

How much of a Glassblower’s job can AI already do?

A stock gather comes earlier. Gathering, blowing without leaving stress in the piece do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Glassblower

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Furnace, pipe and the gather.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Blow, shape and the one that drops.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Anneal, cut and the stresses.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Order, the colour and the one that misses.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The heat, the rhythm and not rushing the anneal.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
No stress, and not leaving it raw.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • gather glass
  • blow
  • pipe
  • anneal
  • stresses
  • glass furnace
  • glass moulds
  • cut the cane

Sources for this job· O*NET 51-9195.00· ESCO/ISCO 7315

Rebar worker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Cutting list, diameters and steel order.
Estimate

No public source provides a precise figure. This is our estimate.

16%30%+4.8
Cut, bend and tie rebar.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Slabs, columns and starter bars.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, crane and safety.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, kilos and extras.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving cover too short.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%17%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Cutting list, diameters and steel order
  • Cut, bend and tie rebar
  • Slabs, columns and starter bars
  • Site, crane and safety
  • Logs, kilos and extras
  • Not leaving cover too short
  • ferrallista
  • armador de hierro
  • rebar

Sources for this job· O*NET 47-2171.00· ESCO/ISCO 7214

Analyse my job

Jobs with similar scores

  1. 554Tractor driver19%
  2. 555Stagehand19%
  3. 556Valet19%
  4. 558Stained-glass artist19%
  5. 559Cobbler19%
  6. 560Dog trainer18%