IS WORK OVER?

Automation index

How much of a Glazier’s job can AI already do?

A measure and an order come earlier. Lifting a pane and not breaking it do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Glazier

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, order glass and ironmongery.
Estimate

No public source provides a precise figure. This is our estimate.

16%30%+4.8
Cut, set and seal.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Heights, suckers and not breaking the pane.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, client and protection.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, quantities and extras.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Not leaving glass that whistles or leaks.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%17%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Measure, order glass and ironmongery
  • Cut, set and seal
  • Heights, suckers and not breaking the pane
  • Site, client and protection
  • Logs, quantities and extras
  • Not leaving glass that whistles or leaks
  • cristalero
  • glazier
  • vidriero

Sources for this job· O*NET 47-2121.00· ESCO/ISCO 7115

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 696Kitchen porter17%
  2. 697Forklift operator17%
  3. 698Air traffic controller17%
  4. 700Rebar worker17%
  5. 701Makeup artist17%
  6. 702Sailor17%