IS WORK OVER?

Automation index

How much of a Glazier’s job can AI already do?

A measure and an order come earlier. Lifting a pane and not breaking it do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Glazier

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, order glass and ironmongery.
Estimate

No public source provides a precise figure. This is our estimate.

16%30%+4.8
Cut, set and seal.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Heights, suckers and not breaking the pane.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, client and protection.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, quantities and extras.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Not leaving glass that whistles or leaks.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%17%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Measure, order glass and ironmongery
  • Cut, set and seal
  • Heights, suckers and not breaking the pane
  • Site, client and protection
  • Logs, quantities and extras
  • Not leaving glass that whistles or leaks
  • cristalero
  • glazier
  • vidriero

Sources for this job· O*NET 47-2121.00· ESCO/ISCO 7115

Tower crane operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Radius, winds and the day’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Hoist, trolley and the slinger’s call.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Erect, climb and the base that is checked.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Two-crane lifts and crossing jibs.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The wind that gets up and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Sweep nobody, and not pushing the radius.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • tower-crane lifts
  • load charts
  • climb the crane
  • slinger’s call
  • jib wind
  • crossing jibs
  • crane base
  • trolley

Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343

Analyse my job

Jobs with similar scores

  1. 596Kitchen porter17%
  2. 597Forklift operator17%
  3. 598Air traffic controller17%
  4. 600Rebar worker17%
  5. 601Makeup artist17%
  6. 602Sailor17%