Automation index
How much of a Golf professional’s job can AI already do?
A swing clip comes earlier. Changing the strike so the handicap comes down do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Golf professional
22%
AI can already do 22% of this job.
#445 / 753
View rankingGolf professional
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Swing, clip and the plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Course, the pupil and the one who does not listen.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Putting, the green and patience.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Handicap, the event and not inflating.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The shop, the club and not selling smoke.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Bring the handicap down, and not breaking the swing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- swing
- strike clip
- putting
- handicap
- the green
- events
- clubs
- the range
Sources for this job· O*NET 27-2022.00· ESCO/ISCO 3422
IS WORK OVER?
Gas network engineer
22%
#397 / 753
View rankingGas network engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, pressures and the diameter.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Trench, the weld and the one that was not x-rayed.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Leak, the detector and getting people out.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Cut, the bypass and not leaving them without gas.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The council, the rush and not covering without testing.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the trench does not go up, and not leaving them without gas.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- network pressures
- diameters
- trenches
- gas welds
- leaks
- detectors
- bypass
- x-rays
Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2145