Automation index
How much of a Golf professional’s job can AI already do?
A swing clip comes earlier. Changing the strike so the handicap comes down do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Golf professional
22%
AI can already do 22% of this job.
#378 / 643
View rankingGolf professional
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Swing, clip and the plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Course, the pupil and the one who does not listen.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Putting, the green and patience.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Handicap, the event and not inflating.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The shop, the club and not selling smoke.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Bring the handicap down, and not breaking the swing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- swing
- strike clip
- putting
- handicap
- the green
- events
- clubs
- the range
Sources for this job· O*NET 27-2022.00· ESCO/ISCO 3422
IS WORK OVER?
Welding inspector
22%
#349 / 643
View rankingWelding inspector
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
WPS, qualification and the bead.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Visual, the pore and the one that hides.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
NDT, the report and not contradicting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Site, the access and the welder who rushes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The deadline, the pressure and not signing the pore.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Accept the sound bead.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- WPS
- beads
- pores
- welder qualification
- weld NDT
- site
- access
- inspection reports
Sources for this job· O*NET 51-9061.00· ESCO/ISCO 3119