Automation index
Can AI do the work of a Graphic designer?
Today an AI can already spin variants and assemble a first cut. Deciding what works, what ships, and why, is still direction.
It does not predict how many jobs will disappear.
Task comparison
IS WORK OVER?
Graphic designer
28%
AI or a robot can already do 28% of this job.
#58 / 103
View rankingGraphic designer
Where the time goes
Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.
Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.
| Task | Share | AI | Adds |
|---|---|---|---|
Determine size and arrangement of illustrative material and copy, and select style and size of type.EstimateNo public source pins this saving. It is an estimate of the method. | 12% | 28% | +3.4 |
Create designs, concepts, and sample layouts, based on knowledge of layout principles and esthetic design concepts.EstimateNo public source pins this saving. It is an estimate of the method. | 11% | 28% | +3.1 |
Use computer software to generate new images.EstimateNo public source pins this saving. It is an estimate of the method. | 10% | 28% | +2.8 |
Key information into computer equipment to create layouts for client or supervisor.EstimateNo public source pins this saving. It is an estimate of the method. | 8% | 22% | +1.8 |
Draw and print charts, graphs, illustrations, and other artwork, using computer.EstimateNo public source pins this saving. It is an estimate of the method. | 7% | 28% | +2 |
Review final layouts and suggest improvements, as needed.EstimateNo public source pins this saving. It is an estimate of the method. | 7% | 28% | +2 |
Maintain archive of images, photos, or previous work products.EstimateNo public source pins this saving. It is an estimate of the method. | 6% | 28% | +1.7 |
Develop graphics and layouts for product illustrations, company logos, and Web sites.EstimateNo public source pins this saving. It is an estimate of the method. | 6% | 28% | +1.7 |
Other less frequent tasks (weight estimated from frequency).EstimateNo public source pins this saving. It is an estimate of the method. | 33% | 28% | +9.2 |
| Total | 100% | 28% |
Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low
Skills this job uses
- design interfaces
- prototypes
- figma
- graphic design
- desktop publishing
- copyright legislation
- respect publication formats
- use creative suite software
- follow a brief
- identify customer's needs
Sources for this job· O*NET 27-1024.00· ESCO/ISCO 2166
IS WORK OVER?
Plumber
28%↑
#60 / 103
View rankingPlumber
Where the time goes
Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.
Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.
| Task | Share | AI | Adds |
|---|---|---|---|
Cut, thread, or hammer pipes to specifications, using tools such as saws, cutting torches, pipe threaders, or pipe benders.EstimateNo public source pins this saving. It is an estimate of the method. | 7% | 28% | +2 |
Locate and mark the position of pipe installations, connections, passage holes, or fixtures in structures, using measuring instruments such as rulers or levels.EstimateNo public source pins this saving. It is an estimate of the method. | 7% | 28% | +2 |
Direct helpers engaged in pipe cutting, preassembly, or installation of plumbing systems or components.EstimateNo public source pins this saving. It is an estimate of the method. | 6% | 28% | +1.7 |
Select pipe sizes, types, or related materials, such as supports, hangers, or hydraulic cylinders, according to specifications.EstimateNo public source pins this saving. It is an estimate of the method. | 6% | 28% | +1.7 |
Lay out full scale drawings of pipe systems, supports, or related equipment, according to blueprints.EstimateNo public source pins this saving. It is an estimate of the method. | 6% | 28% | +1.7 |
Assemble pipe sections, tubing, or fittings, using couplings, clamps, screws, bolts, cement, plastic solvent, caulking, or soldering, brazing, or welding equipment.EstimateNo public source pins this saving. It is an estimate of the method. | 5% | 28% | +1.4 |
Attach pipes to walls, structures, or fixtures, such as radiators or tanks, using brackets, clamps, tools, or welding equipment.EstimateNo public source pins this saving. It is an estimate of the method. | 5% | 28% | +1.4 |
Install pipe assemblies, fittings, valves, appliances such as dishwashers or water heaters, or fixtures such as sinks or toilets, using hand or power tools.EstimateNo public source pins this saving. It is an estimate of the method. | 5% | 28% | +1.4 |
Other less frequent tasks (weight estimated from frequency).EstimateNo public source pins this saving. It is an estimate of the method. | 53% | 28% | +14.8 |
| Total | 100% | 28% |
Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low
Skills this job uses
- pipes
- blockages
- solder copper
- sanitary ware
- plumbing tools
- types of piping
- replace faucets
- work ergonomically
- prepare copper pipes for use as gas lines
- snap chalk line
Sources for this job· O*NET 47-2152.00· ESCO/ISCO 7126