Automation index
How much of a Greengrocer’s job can AI already do?
A wholesale order comes earlier. Setting the stall without selling the gone piece do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Greengrocer
22%
AI can already do 22% of this job.
#335 / 633
View rankingGreengrocer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Wholesale, season and what is at its point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Stall, replenish and the piece that softens.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Customer, advice and the one who cannot ripen it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Shrink, cold and closing the day.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The market, the rain and not leaving the stall alone.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
At its point, and not selling what is gone.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- set the stall
- fruit season
- replenish fruit
- shrink
- ripen
- the market
- wholesale
- advise the customer
Sources for this job· O*NET 41-2031.00· ESCO/ISCO 5223
IS WORK OVER?
Aerospace engineer
25%
#228 / 633
View rankingAerospace engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Calculate, simulate and certify structures and systems.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Drawings, tolerances and traceability.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bench, test flight and incidents.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Vendors, quality and EASA.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Documentation, versions and configuration.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign something that will not fall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Drawings, tolerances and traceability
- Bench, test flight and incidents
- Vendors, quality and EASA
- Documentation, versions and configuration
- Sign something that will not fall
- ingeniero aeronautico
- aerospace engineer
Sources for this job· O*NET 17-2011.00· ESCO/ISCO 2144