Automation index
How much of a Greengrocer’s job can AI already do?
A wholesale order comes earlier. Setting the stall without selling the gone piece do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Greengrocer
22%
AI can already do 22% of this job.
#378 / 733
View rankingGreengrocer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Wholesale, season and what is at its point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Stall, replenish and the piece that softens.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Customer, advice and the one who cannot ripen it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Shrink, cold and closing the day.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The market, the rain and not leaving the stall alone.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
At its point, and not selling what is gone.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- set the stall
- fruit season
- replenish fruit
- shrink
- ripen
- the market
- wholesale
- advise the customer
Sources for this job· O*NET 41-2031.00· ESCO/ISCO 5223
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142