IS WORK OVER?

Automation index

How much of a Haematologist’s job can AI already do?

A blood count and a first outline come earlier. Calling a transplant and talking to the family do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Haematologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read blood counts, smears and marrow studies.
Estimate

No public source provides a precise figure. This is our estimate.

16%48%+7.7
Clinic, examination and the plan with the patient.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Order chemo, anticoagulants and transfusion support.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Procedures: marrow, apheresis and venous access.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Tumour board, consults and the ward day.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
On-call, haematology emergency and signing the treatment.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%23%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • read blood counts
  • order transfusions
  • treat anaemias
  • diagnose leukaemias
  • apheresis
  • haematology clinic
  • marrow studies
  • anticoagulation

Sources for this job· O*NET 29-1229.03· ESCO/ISCO 2212

Embroiderer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Drawing, hoop and thread colour.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Stitch, raised work and the one that tangles.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Machine, program and the one that eats the cloth.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Finish, the back and not leaving knots.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The garment, the deadline and not changing the drawing halfway.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That the thread tells, and not pulling the cloth.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • hoop
  • raised work
  • stitches
  • threads
  • the back
  • machine programs
  • pricked drawings
  • knots

Sources for this job· O*NET 51-6051.00· ESCO/ISCO 7533

Analyse my job

Jobs with similar scores

  1. 294Art director23%
  2. 295Occupational trainer23%
  3. 296Geologist23%
  4. 298Infectious disease physician23%
  5. 299Labour inspector23%
  6. 300Alarm installer23%