IS WORK OVER?

Automation index

How much of a Haematologist’s job can AI already do?

A blood count and a first outline come earlier. Calling a transplant and talking to the family do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Haematologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read blood counts, smears and marrow studies.
Estimate

No public source provides a precise figure. This is our estimate.

16%48%+7.7
Clinic, examination and the plan with the patient.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Order chemo, anticoagulants and transfusion support.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Procedures: marrow, apheresis and venous access.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Tumour board, consults and the ward day.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
On-call, haematology emergency and signing the treatment.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%23%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • read blood counts
  • order transfusions
  • treat anaemias
  • diagnose leukaemias
  • apheresis
  • haematology clinic
  • marrow studies
  • anticoagulation

Sources for this job· O*NET 29-1229.03· ESCO/ISCO 2212

Geotechnical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Borehole, the sample and the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the water table and the one that was not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Foundations, the clay and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Slope, the factor and not signing the one that slips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The architect, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If it stands, sign it. And not hiding the clay.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boreholes
  • water table
  • clays
  • foundations
  • slopes
  • soil samples
  • geotech reports
  • factors of safety

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 328Art director23%
  2. 329Occupational trainer23%
  3. 330Geologist23%
  4. 332Infectious disease physician23%
  5. 333Labour inspector23%
  6. 334Alarm installer23%