IS WORK OVER?

Automation index

How much of a Harbour pilot’s job can AI already do?

A chart and a current come earlier. Putting the ship in the basin with a beam wind do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Harbour pilot

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Chart, draught and the manoeuvre plan.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Board, conning and the tug.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Wind, current and coming alongside.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Pilotage, the master and not fighting the bridge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Fog, the closure and the yes or no to enter.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Get it in whole, and not scraping the bottom.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • pilotage
  • conning
  • draughts
  • tugs
  • come alongside
  • charts
  • beam wind
  • the basin

Sources for this job· O*NET 53-5021.00· ESCO/ISCO 3152

Aerial technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Bookings, levels and install logs.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Roof, mast, cable and outlet.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Configure, tune and explain to the neighbour.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Community, porter and access.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Faults, building ICT and fibre.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Not falling and not leaving a building without the match.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Bookings, levels and install logs
  • Roof, mast, cable and outlet
  • Community, porter and access
  • Faults, building ICT and fibre
  • antenista
  • instalador de antenas
  • aerial technician

Sources for this job· O*NET 49-2022.00· ESCO/ISCO 7422

Analyse my job

Jobs with similar scores

  1. 462Perfusionist20%
  2. 463Pizza maker20%
  3. 464Politician20%
  4. 466Chiropractor20%
  5. 467Cabin manager20%
  6. 468Lift technician20%