Automation index
How much of a Harbour pilot’s job can AI already do?
A chart and a current come earlier. Putting the ship in the basin with a beam wind do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Harbour pilot
20%
AI can already do 20% of this job.
#465 / 633
View rankingHarbour pilot
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Chart, draught and the manoeuvre plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Board, conning and the tug.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Wind, current and coming alongside.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Pilotage, the master and not fighting the bridge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Fog, the closure and the yes or no to enter.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Get it in whole, and not scraping the bottom.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- pilotage
- conning
- draughts
- tugs
- come alongside
- charts
- beam wind
- the basin
Sources for this job· O*NET 53-5021.00· ESCO/ISCO 3152
IS WORK OVER?
Crane operator
16%
#605 / 633
View rankingCrane operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Lift plan, radii and weights.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Run the crane and place the load.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Signals, wind and exclusion zone.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site, foreman and maintenance.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Logs, inspections and machine tests.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Not leaving a load over someone.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 16% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Lift plan, radii and weights
- Run the crane and place the load
- Signals, wind and exclusion zone
- Site, foreman and maintenance
- Logs, inspections and machine tests
- Not leaving a load over someone
- gruista
- operador de grua
- crane operator
Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343