IS WORK OVER?

Automation index

How much of a Harbour pilot’s job can AI already do?

A chart and a current come earlier. Putting the ship in the basin with a beam wind do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Harbour pilot

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Chart, draught and the manoeuvre plan.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Board, conning and the tug.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Wind, current and coming alongside.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Pilotage, the master and not fighting the bridge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Fog, the closure and the yes or no to enter.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Get it in whole, and not scraping the bottom.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • pilotage
  • conning
  • draughts
  • tugs
  • come alongside
  • charts
  • beam wind
  • the basin

Sources for this job· O*NET 53-5021.00· ESCO/ISCO 3152

Facilities engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
CMMS, tickets and the PPM.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Roof, the chiller and the one that will not start.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Generator, the diesel and not leaving it dry.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Fire, the pump and the monthly test.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The tenant, August and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That cooling does not die, and not leaving the generator dry.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • CMMS
  • PPM
  • chillers
  • generators
  • diesel
  • fire pumps
  • roofs
  • tickets

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 557Perfusionist20%
  2. 558Pizza maker20%
  3. 559Politician20%
  4. 561Chiropractor20%
  5. 562Cabin manager20%
  6. 563Lift technician20%