Automation index
How much of a Harbour pilot’s job can AI already do?
A chart and a current come earlier. Putting the ship in the basin with a beam wind do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Harbour pilot
20%
AI can already do 20% of this job.
#580 / 773
View rankingHarbour pilot
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Chart, draught and the manoeuvre plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Board, conning and the tug.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Wind, current and coming alongside.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Pilotage, the master and not fighting the bridge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Fog, the closure and the yes or no to enter.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Get it in whole, and not scraping the bottom.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- pilotage
- conning
- draughts
- tugs
- come alongside
- charts
- beam wind
- the basin
Sources for this job· O*NET 53-5021.00· ESCO/ISCO 3152
IS WORK OVER?
Firmware engineer
22%
#409 / 773
View rankingFirmware engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Image, the signature and the slot.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Flash, the batch and the one that bricks.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Rollback, the test and not skipping it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Boot, the brick and the one that will not start.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The factory, the cadence and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Flash without bricking, and not skipping rollback.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- firmware images
- digital signature
- slots
- flash
- rollback
- boot
- factory batches
- not brick
Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2514