IS WORK OVER?

Automation index

How much of a Harbour pilot’s job can AI already do?

A chart and a current come earlier. Putting the ship in the basin with a beam wind do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Harbour pilot

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Chart, draught and the manoeuvre plan.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Board, conning and the tug.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Wind, current and coming alongside.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Pilotage, the master and not fighting the bridge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Fog, the closure and the yes or no to enter.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Get it in whole, and not scraping the bottom.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • pilotage
  • conning
  • draughts
  • tugs
  • come alongside
  • charts
  • beam wind
  • the basin

Sources for this job· O*NET 53-5021.00· ESCO/ISCO 3152

Hydrogen technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
ATEX, purge and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Electrolyser, the stack and the one that drops.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Leak, detector and stopping.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Charge, the tube and not mixing with air.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the station and not skipping the purge.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
No leak, and the protocol done.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • ATEX
  • purge
  • electrolyser
  • H2 detectors
  • stacks
  • hydrogen stations
  • leaks
  • mix with air

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 471Perfusionist20%
  2. 472Pizza maker20%
  3. 473Politician20%
  4. 475Chiropractor20%
  5. 476Cabin manager20%
  6. 477Lift technician20%