IS WORK OVER?

Automation index

How much of a Harbour pilot’s job can AI already do?

A chart and a current come earlier. Putting the ship in the basin with a beam wind do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Harbour pilot

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Chart, draught and the manoeuvre plan.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Board, conning and the tug.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Wind, current and coming alongside.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Pilotage, the master and not fighting the bridge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Fog, the closure and the yes or no to enter.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Get it in whole, and not scraping the bottom.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • pilotage
  • conning
  • draughts
  • tugs
  • come alongside
  • charts
  • beam wind
  • the basin

Sources for this job· O*NET 53-5021.00· ESCO/ISCO 3152

Wind-turbine technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
SCADA, the code and the spare.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Climb, the wind and the one who is sick.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Nacelle, the oil and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Rescue, the protocol and not improvising.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The storm, the access and aborting.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Come down whole, and the turbine running.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • farm SCADA
  • climb the tower
  • nacelle
  • height rescue
  • oils
  • fault codes
  • access
  • wind

Sources for this job· O*NET 49-9081.00· ESCO/ISCO 7412

Analyse my job

Jobs with similar scores

  1. 471Perfusionist20%
  2. 472Pizza maker20%
  3. 473Politician20%
  4. 475Chiropractor20%
  5. 476Cabin manager20%
  6. 477Lift technician20%