Automation index
How much of a Headteacher’s job can AI already do?
A timetable comes earlier. The school not falling over on Monday without hiding the clash do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Headteacher
27%
AI can already do 27% of this job.
#152 / 733
View rankingHeadteacher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Timetable, quotas and the staff.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Family, the complaint and the one that reaches inspection.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Behaviour, the sanction and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Budget, the club and not leaving a hole.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Inspection, the figure and not dressing it.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That Monday holds, and not hiding the clash.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- school timetables
- quotas
- behaviour
- sanctions
- school budget
- inspection
- family complaints
- senior staff
Sources for this job· O*NET 11-9032.00· ESCO/ISCO 1345
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142