Automation index
How much of a Health inspector’s job can AI already do?
A HACCP list comes earlier. Shutting the workshop and pulling the batch do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Health inspector
24%
AI can already do 24% of this job.
#302 / 733
View rankingHealth inspector
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Inspection, HACCP and the premises history.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Kitchen, workshop or farm and what is behind.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Minutes, holds and pulling the batch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Outbreaks, samples and the lab.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The precautionary closure and the one who kicks off.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That nobody gets ill, and signing the minute.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- inspect workshops
- HACCP
- hold batches
- close premises
- take samples
- food outbreaks
- health minutes
- food hygiene
Sources for this job· O*NET 19-5012.00· ESCO/ISCO 2263
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142