IS WORK OVER?

Automation index

How much of a Health inspector’s job can AI already do?

A HACCP list comes earlier. Shutting the workshop and pulling the batch do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Health inspector

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Inspection, HACCP and the premises history.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Kitchen, workshop or farm and what is behind.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Minutes, holds and pulling the batch.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Outbreaks, samples and the lab.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The precautionary closure and the one who kicks off.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That nobody gets ill, and signing the minute.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • inspect workshops
  • HACCP
  • hold batches
  • close premises
  • take samples
  • food outbreaks
  • health minutes
  • food hygiene

Sources for this job· O*NET 19-5012.00· ESCO/ISCO 2263

Geomatics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Station, the base and the cloud.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the axis and the one that moved.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Model, the drift and not hiding metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the setting-out and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not signing the drift.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the axis is there, and not signing metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • point clouds
  • total stations
  • axes
  • setting-out
  • drift
  • bases
  • geomatics
  • the field

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Analyse my job

Jobs with similar scores

  1. 304Electrician24%
  2. 305Nurse24%
  3. 306Nuclear engineer24%
  4. 308Interpreter24%
  5. 309Warehouse supervisor24%
  6. 310Jeweller24%