Automation index
How much of a Health inspector’s job can AI already do?
A HACCP list comes earlier. Shutting the workshop and pulling the batch do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Health inspector
24%
AI can already do 24% of this job.
#268 / 633
View rankingHealth inspector
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Inspection, HACCP and the premises history.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Kitchen, workshop or farm and what is behind.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Minutes, holds and pulling the batch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Outbreaks, samples and the lab.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The precautionary closure and the one who kicks off.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That nobody gets ill, and signing the minute.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- inspect workshops
- HACCP
- hold batches
- close premises
- take samples
- food outbreaks
- health minutes
- food hygiene
Sources for this job· O*NET 19-5012.00· ESCO/ISCO 2263
IS WORK OVER?
Nuclear engineer
24%
#267 / 633
View rankingNuclear engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Neutronics, thermal-hydraulics and the file.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Control room, tests and the set-point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Licence, the regulator and the safety analyses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Outage, reload and spent fuel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
The event, safety culture and the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Not playing with reactivity, and signing the analysis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- neutronics
- thermal-hydraulics
- nuclear licence
- reload
- safety analysis
- control room
- spent fuel
- safety culture
Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149