Automation index
How much of a Health inspector’s job can AI already do?
A HACCP list comes earlier. Shutting the workshop and pulling the batch do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Health inspector
24%
AI can already do 24% of this job.
#307 / 753
View rankingHealth inspector
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Inspection, HACCP and the premises history.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Kitchen, workshop or farm and what is behind.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Minutes, holds and pulling the batch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Outbreaks, samples and the lab.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The precautionary closure and the one who kicks off.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That nobody gets ill, and signing the minute.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- inspect workshops
- HACCP
- hold batches
- close premises
- take samples
- food outbreaks
- health minutes
- food hygiene
Sources for this job· O*NET 19-5012.00· ESCO/ISCO 2263
IS WORK OVER?
Requirements engineer
27%
#181 / 753
View rankingRequirements engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Workshop, the actor and the requirement.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Conflict, the loudest and not swallowing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Criterion, the test and not leaving it vague.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Change, the impact and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The project lead, the deadline and not cutting the one that matters.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it is needed, and not the loudest one's.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- requirements
- actor workshops
- acceptance criteria
- change impact
- backlog
- tests
- not swallow the loudest
- ambiguity
Sources for this job· O*NET 15-1299.00· ESCO/ISCO 2511