Automation index
How much of a Health inspector’s job can AI already do?
A HACCP list comes earlier. Shutting the workshop and pulling the batch do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Health inspector
24%
AI can already do 24% of this job.
#273 / 643
View rankingHealth inspector
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Inspection, HACCP and the premises history.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Kitchen, workshop or farm and what is behind.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Minutes, holds and pulling the batch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Outbreaks, samples and the lab.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The precautionary closure and the one who kicks off.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That nobody gets ill, and signing the minute.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- inspect workshops
- HACCP
- hold batches
- close premises
- take samples
- food outbreaks
- health minutes
- food hygiene
Sources for this job· O*NET 19-5012.00· ESCO/ISCO 2263
IS WORK OVER?
Wind-turbine technician
19%
#546 / 643
View rankingWind-turbine technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
SCADA, the code and the spare.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Climb, the wind and the one who is sick.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Nacelle, the oil and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Rescue, the protocol and not improvising.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The storm, the access and aborting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Come down whole, and the turbine running.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- farm SCADA
- climb the tower
- nacelle
- height rescue
- oils
- fault codes
- access
- wind
Sources for this job· O*NET 49-9081.00· ESCO/ISCO 7412