Automation index
How much of a Hearing aid technician’s job can AI already do?
An earmould and a gain curve come earlier. Getting the patient to hear and live with it do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Hearing aid technician
24%
AI can already do 24% of this job.
#317 / 743
View rankingHearing aid technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Audiometry, thresholds and the fitting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Take the mould, trial and the one who hates the whistle.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Program, verify and retune the aid.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Repair, batteries and aftercare.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Explain, family and the stigma of the device.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That they actually hear, and not taking the aid back.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- fit hearing aids
- take earmoulds
- audiometry
- program aids
- verify gain
- repair aids
- hearing thresholds
- aftercare
Sources for this job· O*NET 29-2092.00· ESCO/ISCO 3214
IS WORK OVER?
Corrosion engineer
22%
#387 / 743
View rankingCorrosion engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Thicknesses, the map and the coupon.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, the pipe and the one that is thin.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Cathode, the protection and the one that will not take.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Shutdown, the coating and not painting over rust.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Operations, the rush and not leaving the thin one in service.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Stop before it goes, and not painting over it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- thicknesses
- corrosion maps
- cathodic protection
- coatings
- thin pipes
- shutdowns
- rust
- coupons
Sources for this job· O*NET 17-2131.00· ESCO/ISCO 2145