Automation index
How much of a Hearing aid technician’s job can AI already do?
An earmould and a gain curve come earlier. Getting the patient to hear and live with it do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Hearing aid technician
24%
AI can already do 24% of this job.
#281 / 623
View rankingHearing aid technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Audiometry, thresholds and the fitting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Take the mould, trial and the one who hates the whistle.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Program, verify and retune the aid.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Repair, batteries and aftercare.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Explain, family and the stigma of the device.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That they actually hear, and not taking the aid back.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- fit hearing aids
- take earmoulds
- audiometry
- program aids
- verify gain
- repair aids
- hearing thresholds
- aftercare
Sources for this job· O*NET 29-2092.00· ESCO/ISCO 3214
IS WORK OVER?
Process engineer
26%
#205 / 623
View rankingProcess engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
P&IDs, balances and the operating procedure.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Plant, trials and the real bottleneck.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Capacity, yields and the improvement report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Start-up, shutdown and the shift that skips the SOP.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Process safety and the HAZOP that hurts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Not overloading the reactor, and signing the change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- P&IDs
- mass balances
- HAZOP
- plant start-up
- improve yields
- SOP
- bottlenecks
- process safety
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141