IS WORK OVER?

Automation index

How much of a Heat-pump technician’s job can AI already do?

A load calc comes earlier. Actually heating without freezing the unit do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Heat-pump technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Load, diagram and machine sizing.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Install, vacuum and the refrigerant charge.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Commission, curves and hot water.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Sensors, fan-coils and noise to the neighbour.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Winter, defrost and the complaint.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it heats, and not freezing the outdoor unit.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fit heat pumps
  • vacuum the circuit
  • refrigerant charge
  • commission
  • hot water
  • defrost
  • size the unit
  • sensors

Sources for this job· O*NET 49-9021.00· ESCO/ISCO 7126

Piling operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, level and each pile’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive, bore and refusal.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Cage, pour and the tube that rides up.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Vibration, the neighbour and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Plant, access and the one that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
To level, and not cracking party walls.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive piles
  • bore
  • cages
  • refusal level
  • site vibration
  • pour piles
  • piling set-out
  • recoverable tubes

Sources for this job· O*NET 47-2073.00· ESCO/ISCO 7114

Analyse my job

Jobs with similar scores

  1. 377Book restorer22%
  2. 378Ticket inspector22%
  3. 379Cider maker22%
  4. 381Water technician22%
  5. 382Avionics technician22%
  6. 383Calibration technician22%