IS WORK OVER?

Automation index

How much of a Heat-pump technician’s job can AI already do?

A load calc comes earlier. Actually heating without freezing the unit do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Heat-pump technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Load, diagram and machine sizing.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Install, vacuum and the refrigerant charge.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Commission, curves and hot water.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Sensors, fan-coils and noise to the neighbour.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Winter, defrost and the complaint.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it heats, and not freezing the outdoor unit.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fit heat pumps
  • vacuum the circuit
  • refrigerant charge
  • commission
  • hot water
  • defrost
  • size the unit
  • sensors

Sources for this job· O*NET 49-9021.00· ESCO/ISCO 7126

Requirements engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Workshop, the actor and the requirement.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Conflict, the loudest and not swallowing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Criterion, the test and not leaving it vague.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Change, the impact and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The project lead, the deadline and not cutting the one that matters.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it is needed, and not the loudest one's.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • requirements
  • actor workshops
  • acceptance criteria
  • change impact
  • backlog
  • tests
  • not swallow the loudest
  • ambiguity

Sources for this job· O*NET 15-1299.00· ESCO/ISCO 2511

Analyse my job

Jobs with similar scores

  1. 473Ticket inspector22%
  2. 474Cider maker22%
  3. 475Non-commissioned officer22%
  4. 477Water technician22%
  5. 478Avionics technician22%
  6. 479Calibration technician22%