IS WORK OVER?

Automation index

How much of a Hepatologist’s job can AI already do?

A fibroscan comes earlier. Biopsying the liver and calling the transplant do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Hepatologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Labs, fibroscan and the stage.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Clinic, the drink and the one who denies it.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Biopsy, the risk and not needling extra.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Antiviral, adherence and the one who quits.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The transplant board and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Call the liver, and talking to the family.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fibroscan
  • liver biopsy
  • hepatitis
  • cirrhosis
  • liver transplant
  • antivirals
  • liver clinic
  • decompensation

Sources for this job· O*NET 29-1216.00· ESCO/ISCO 2212

Aerospace technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Bench, the protocol and the torque.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Part, the lockwire and the one left loose.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
NDT, the crack and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Engine, the run and the one that does not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The engineer, the rush and not signing half done.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Torque it, and not leaving the lockwire loose.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • test bench
  • torque
  • lockwire
  • aerospace NDT
  • engine runs
  • protocols
  • cracks
  • not sign half done

Sources for this job· O*NET 17-3021.00· ESCO/ISCO 3115

Analyse my job

Jobs with similar scores

  1. 165Geneticist27%
  2. 166Collections officer27%
  3. 167Wealth manager27%
  4. 169Printing press operator27%
  5. 170Acoustics engineer27%
  6. 171Food engineer27%