Automation index
How much of a Hepatologist’s job can AI already do?
A fibroscan comes earlier. Biopsying the liver and calling the transplant do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Hepatologist
27%
AI can already do 27% of this job.
#168 / 743
View rankingHepatologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Labs, fibroscan and the stage.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Clinic, the drink and the one who denies it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Biopsy, the risk and not needling extra.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Antiviral, adherence and the one who quits.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The transplant board and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Call the liver, and talking to the family.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- fibroscan
- liver biopsy
- hepatitis
- cirrhosis
- liver transplant
- antivirals
- liver clinic
- decompensation
Sources for this job· O*NET 29-1216.00· ESCO/ISCO 2212
IS WORK OVER?
Power engineer
22%
#395 / 743
View rankingPower engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Study, the short-circuit and selectivity.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Substation, the disconnector and the lockout.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Switching, the five rules and not skipping them.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Fault, the relay and not resetting blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not working live.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not blow, and not working live.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- short-circuits
- selectivity
- disconnectors
- five rules
- relays
- substations
- lockouts
- not work live
Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151