Automation index
How much of a Histology technician’s job can AI already do?
A processor comes earlier. Cutting the block without losing the diagnosis on the knife do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Histology technician
19%
AI can already do 19% of this job.
#554 / 653
View rankingHistology technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Intake, the pot and not mixing cases.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Process, embed and the block.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Cut, the knife and the one that falls apart.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Stain, the control and the one that will not take.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The pathologist, the rush and not sending a bad cut.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Not losing the diagnosis on the knife.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- paraffin blocks
- histology cutting
- stains
- tissue processor
- not mix cases
- microtome knife
- stain controls
- embedding
Sources for this job· O*NET 29-2012.00· ESCO/ISCO 3212
IS WORK OVER?
Renewables engineer
27%
#165 / 653
View rankingRenewables engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Resource, layout and the yield model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Site, topography and the cable that will not reach.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Permits, grid point and the TSO.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
EPC, commissioning and export tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The neighbour, the council and the appeal against the plant.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it exports, and not inflating equivalent hours.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- plant layout
- solar resource
- grid connection
- commissioning
- renewables permits
- yield model
- export tests
- EPC
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149