Automation index
How much of a Hospital porter’s job can AI already do?
A transfer ping comes earlier. Moving someone on drips and not dropping them does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Hospital porter
16%
AI can already do 16% of this job.
#731 / 763
View rankingHospital porter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Alerts, destinations and transfer notes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Trolleys, chairs and moving patients.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Theatre, mortuary and hospital stores.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Dealing with families, discharges and waits.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Support nursing and bay safety.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Shifts, physical load and not hurting your back.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 16% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Alerts, destinations and transfer notes
- Trolleys, chairs and moving patients
- Theatre, mortuary and hospital stores
- Support nursing and bay safety
- celador
- camillero
- hospital porter
Sources for this job· O*NET 31-1132.00· ESCO/ISCO 5329
IS WORK OVER?
Aerospace technician
19%
#657 / 763
View rankingAerospace technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Bench, the protocol and the torque.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Part, the lockwire and the one left loose.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
NDT, the crack and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Engine, the run and the one that does not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The engineer, the rush and not signing half done.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Torque it, and not leaving the lockwire loose.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- test bench
- torque
- lockwire
- aerospace NDT
- engine runs
- protocols
- cracks
- not sign half done
Sources for this job· O*NET 17-3021.00· ESCO/ISCO 3115