Automation index
How much of a Hospital porter’s job can AI already do?
A transfer ping comes earlier. Moving someone on drips and not dropping them does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Hospital porter
16%
AI can already do 16% of this job.
#711 / 743
View rankingHospital porter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Alerts, destinations and transfer notes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Trolleys, chairs and moving patients.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Theatre, mortuary and hospital stores.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Dealing with families, discharges and waits.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Support nursing and bay safety.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Shifts, physical load and not hurting your back.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 16% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Alerts, destinations and transfer notes
- Trolleys, chairs and moving patients
- Theatre, mortuary and hospital stores
- Support nursing and bay safety
- celador
- camillero
- hospital porter
Sources for this job· O*NET 31-1132.00· ESCO/ISCO 5329
IS WORK OVER?
Railway engineer
22%
#396 / 743
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142