IS WORK OVER?

Automation index

How much of a Hotel manager’s job can AI already do?

An occupancy forecast comes earlier. The house running without breakfast collapsing do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Hotel manager

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Occupancy, rates and the forecast.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Shifts, complaints and the one who leaves staff.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Owner, the budget and not cutting breakfast.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Incident, the VIP and the one who floods the room.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The inspection, insurance and not dressing the log.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That the house runs, and breakfast standing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • occupancy
  • hotel forecast
  • shifts
  • complaints
  • VIP
  • breakfast
  • inspection
  • rates

Sources for this job· O*NET 11-9081.00· ESCO/ISCO 1411

Electronics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Schematic, simulation and PCB layout.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Firmware, tests and bench.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Vendors, prototypes and certifications.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Debug EMC and field faults.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Documentation, versioning and quality.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not sending a blind board to manufacture.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Schematic, simulation and PCB layout
  • Firmware, tests and bench
  • Vendors, prototypes and certifications
  • Debug EMC and field faults
  • Documentation, versioning and quality
  • Not sending a blind board to manufacture
  • ingeniero electronico
  • electronics engineer

Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2152

Analyse my job

Jobs with similar scores

  1. 144Truck driver27%
  2. 145Franchise consultant27%
  3. 146Comic artist27%
  4. 148Spa manager27%
  5. 149Sporting director27%
  6. 150Personal trainer27%