Automation index
How much of a Hotel manager’s job can AI already do?
An occupancy forecast comes earlier. The house running without breakfast collapsing do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Hotel manager
27%
AI can already do 27% of this job.
#153 / 753
View rankingHotel manager
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Occupancy, rates and the forecast.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Shifts, complaints and the one who leaves staff.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Owner, the budget and not cutting breakfast.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Incident, the VIP and the one who floods the room.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The inspection, insurance and not dressing the log.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That the house runs, and breakfast standing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- occupancy
- hotel forecast
- shifts
- complaints
- VIP
- breakfast
- inspection
- rates
Sources for this job· O*NET 11-9081.00· ESCO/ISCO 1411
IS WORK OVER?
Geomatics engineer
22%
#402 / 753
View rankingGeomatics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Station, the base and the cloud.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the axis and the one that moved.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Model, the drift and not hiding metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the setting-out and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not signing the drift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the axis is there, and not signing metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- point clouds
- total stations
- axes
- setting-out
- drift
- bases
- geomatics
- the field
Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165