Automation index
How much of a Hotel manager’s job can AI already do?
An occupancy forecast comes earlier. The house running without breakfast collapsing do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Hotel manager
27%
AI can already do 27% of this job.
#147 / 633
View rankingHotel manager
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Occupancy, rates and the forecast.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Shifts, complaints and the one who leaves staff.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Owner, the budget and not cutting breakfast.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Incident, the VIP and the one who floods the room.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The inspection, insurance and not dressing the log.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That the house runs, and breakfast standing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- occupancy
- hotel forecast
- shifts
- complaints
- VIP
- breakfast
- inspection
- rates
Sources for this job· O*NET 11-9081.00· ESCO/ISCO 1411
IS WORK OVER?
Mason
15%
#617 / 633
View rankingMason
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read drawings, measure and order material.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 30% | +4.8 |
Setting out and levels on site.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Raise walls, render and plaster.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Floors, tiling and finishing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Safety, scaffolding and clearing the bay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Coordinate with foreman, plumber and electrician.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 15% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- build walls
- plaster
- site work
- Read drawings, measure and order material
- Setting out and levels on site
- Raise walls, render and plaster
- Floors, tiling and finishing
- Safety, scaffolding and clearing the bay
- albanil
- mason
Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112