Automation index
How much of a Hotel manager’s job can AI already do?
An occupancy forecast comes earlier. The house running without breakfast collapsing do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Hotel manager
27%
AI can already do 27% of this job.
#147 / 623
View rankingHotel manager
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Occupancy, rates and the forecast.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Shifts, complaints and the one who leaves staff.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Owner, the budget and not cutting breakfast.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Incident, the VIP and the one who floods the room.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The inspection, insurance and not dressing the log.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That the house runs, and breakfast standing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- occupancy
- hotel forecast
- shifts
- complaints
- VIP
- breakfast
- inspection
- rates
Sources for this job· O*NET 11-9081.00· ESCO/ISCO 1411
IS WORK OVER?
Well driller
19%
#529 / 623
View rankingWell driller
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Location, permit and the progress log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Drill, case and the collapse.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Mud, samples and the geological log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Yield test, pump and the water analysis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The owner, the neighbour and the well that will not yield.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Clean water, and not leaving a blind well.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drill wells
- case
- yield test
- drilling mud
- geological log
- samples
- well pumps
- drilling permits
Sources for this job· O*NET 47-5023.00· ESCO/ISCO 8113