Automation index
How much of a HVAC technician’s job can AI already do?
Today an AI or a robot can hardly do this job for you. The site, the surprises, and the code are settled on the ground.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
HVAC technician
27%
AI can already do 27% of this job.
#181 / 623
View rankingHVAC technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Comply with all applicable standards, policies, or procedures, such as safety procedures or the maintenance of a clean work area.EstimateNo public source provides a precise figure. This is our estimate. | 10% | 28% | +2.8 |
Recommend, develop, or perform preventive or general maintenance procedures, such as cleaning, power-washing, or vacuuming equipment, oiling parts, or changing filters.EstimateNo public source provides a precise figure. This is our estimate. | 8% | 28% | +2.2 |
Test electrical circuits or components for continuity, using electrical test equipment.EstimateNo public source provides a precise figure. This is our estimate. | 6% | 28% | +1.7 |
Discuss heating or cooling system malfunctions with users to isolate problems or to verify that repairs corrected malfunctions.EstimateNo public source provides a precise figure. This is our estimate. | 6% | 12% | +0.7 |
Repair or replace defective equipment, components, or wiring.EstimateNo public source provides a precise figure. This is our estimate. | 6% | 12% | +0.7 |
Keep records of repairs and replacements made and causes of malfunctions.EstimateNo public source provides a precise figure. This is our estimate. | 5% | 12% | +0.6 |
Record and report time, materials, faults, deficiencies, or other unusual occurrences on work orders.EstimateNo public source provides a precise figure. This is our estimate. | 5% | 55% | +2.8 |
Install, connect, or adjust thermostats, humidistats, or timers.EstimateNo public source provides a precise figure. This is our estimate. | 4% | 28% | +1.1 |
Other less frequent tasks (weight estimated from frequency).EstimateNo public source provides a precise figure. This is our estimate. | 50% | 28% | +14 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- refrigerants
- electric heating systems
- hydraulics
- thermodynamics
- fluid mechanics
- domestic cooling systems
- electricity
- electrical wiring plans
- mechanics
- work ergonomically
Sources for this job· O*NET 49-9021.00· ESCO/ISCO 7127
IS WORK OVER?
Scrum master
25%
#251 / 623
View rankingScrum master
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Facilitate ceremonies, boards and notes.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 45% | +9 |
Flow metrics and impediment reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 38% | +6.1 |
Team coaching and internal conflict.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 15% | +2.7 |
Protect the sprint from interruptions.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Train PO and managers in the method.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Change the system, not just the ritual.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Facilitate ceremonies, boards and notes
- Flow metrics and impediment reports
- Team coaching and internal conflict
- Protect the sprint from interruptions
- Train PO and managers in the method
- Change the system, not just the ritual
- scrum master
- agile coach
Sources for this job· O*NET 13-1111.00· ESCO/ISCO 2421