Automation index
How much of a Hydraulic engineer’s job can AI already do?
A floodplain model comes earlier. Sizing the channel so the village does not flood do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Hydraulic engineer
27%
AI can already do 27% of this job.
#170 / 693
View rankingHydraulic engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Hydrology, flows and the floodplain model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Field, section and what LiDAR misses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Drainage works, pumps and the outfall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Water permits and the river authority.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The flood, the village and the yes to the channel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it does not flood, and not trusting the model alone.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- model floodplains
- flows
- drainage
- channel works
- water permits
- pumps
- channel sections
- river authority
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142
IS WORK OVER?
Adult literacy tutor
22%
#335 / 693
View rankingAdult literacy tutor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Level, the sheet and the one who did not come.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Reading, the contract and the small print.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Writing, the form and not doing it for them.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Group, the shame and not exposing them.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The council, the grant and not inflating attendance.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That they read the contract, and not being ashamed.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- syllables
- reading contracts
- forms
- literacy groups
- shame
- small print
- attendance
- not expose
Sources for this job· O*NET 25-3011.00· ESCO/ISCO 2359