IS WORK OVER?

Automation index

How much of a Hydraulic engineer’s job can AI already do?

A floodplain model comes earlier. Sizing the channel so the village does not flood do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Hydraulic engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Hydrology, flows and the floodplain model.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Field, section and what LiDAR misses.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Drainage works, pumps and the outfall.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Water permits and the river authority.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The flood, the village and the yes to the channel.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it does not flood, and not trusting the model alone.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • model floodplains
  • flows
  • drainage
  • channel works
  • water permits
  • pumps
  • channel sections
  • river authority

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Astronomer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Proposal, time and the instrument.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Observe, calibrate and the one that clouds over.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Reduce, the pipeline and the artefact.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Paper, the referee and not jumping.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The facility, the queue and not losing the night.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Reduce, and not selling the find early.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • telescope time
  • calibrate
  • pipelines
  • papers
  • artefacts
  • nights
  • proposals
  • instruments

Sources for this job· O*NET 19-2011.00· ESCO/ISCO 2111

Analyse my job

Jobs with similar scores

  1. 161Packaging engineer27%
  2. 162Materials engineer27%
  3. 163Renewables engineer27%
  4. 165Textile engineer27%
  5. 166Key account manager27%
  6. 167Linguist27%