Automation index
How much of a Hydraulic engineer’s job can AI already do?
A floodplain model comes earlier. Sizing the channel so the village does not flood do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Hydraulic engineer
27%
AI can already do 27% of this job.
#164 / 633
View rankingHydraulic engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Hydrology, flows and the floodplain model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Field, section and what LiDAR misses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Drainage works, pumps and the outfall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Water permits and the river authority.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The flood, the village and the yes to the channel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it does not flood, and not trusting the model alone.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- model floodplains
- flows
- drainage
- channel works
- water permits
- pumps
- channel sections
- river authority
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142
IS WORK OVER?
Boiler technician
20%
#469 / 633
View rankingBoiler technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Logs, fault codes and spares.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 35% | +5.6 |
Routes, appointments and permits.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Diagnose, open and repair the boiler.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 12% | +2.6 |
Tune-up, combustion and pressures.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
Clients, porters and plant-room access.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Gas, safety and not leaving the building cold.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Logs, fault codes and spares
- Routes, appointments and permits
- Diagnose, open and repair the boiler
- Tune-up, combustion and pressures
- Clients, porters and plant-room access
- calderas
- tecnico de calderas
- calefaccion central
Sources for this job· O*NET 49-9021.00· ESCO/ISCO 7126