Automation index
How much of a Hydraulic engineer’s job can AI already do?
A floodplain model comes earlier. Sizing the channel so the village does not flood do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Hydraulic engineer
27%
AI can already do 27% of this job.
#164 / 633
View rankingHydraulic engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Hydrology, flows and the floodplain model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Field, section and what LiDAR misses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Drainage works, pumps and the outfall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Water permits and the river authority.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The flood, the village and the yes to the channel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it does not flood, and not trusting the model alone.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- model floodplains
- flows
- drainage
- channel works
- water permits
- pumps
- channel sections
- river authority
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142
IS WORK OVER?
Cloud architect
28%
#82 / 633
View rankingCloud architect
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diagrams, ADRs and a first IaC pass.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 48% | +10.6 |
Cost estimate, Well-Architected and gaps.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Review PRs, security and network.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 20% | +3.2 |
Align with security, finops and product.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
PoCs, real failures and vendor limits.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Sign the design and own the incident.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- building plans
- renders
- sign a project
- Diagrams, ADRs and a first IaC pass
- Cost estimate, Well-Architected and gaps
- Review PRs, security and network
- Align with security, finops and product
- PoCs, real failures and vendor limits
- Sign the design and own the incident
- arquitecto cloud
Sources for this job· O*NET 15-1243.01· ESCO/ISCO 2511