IS WORK OVER?

Automation index

How much of a Hydraulic engineer’s job can AI already do?

A floodplain model comes earlier. Sizing the channel so the village does not flood do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Hydraulic engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Hydrology, flows and the floodplain model.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Field, section and what LiDAR misses.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Drainage works, pumps and the outfall.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Water permits and the river authority.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The flood, the village and the yes to the channel.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it does not flood, and not trusting the model alone.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • model floodplains
  • flows
  • drainage
  • channel works
  • water permits
  • pumps
  • channel sections
  • river authority

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Cost engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, rates and the budget.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Works, the variance and the one that was not logged.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Change, the extra and not giving it away.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Close, the dispute and not inflating.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Management, the bid and not selling the reckless one.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
The real number, and not the reckless bid.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • measures
  • unit rates
  • variances
  • extras
  • disputes
  • reckless bids
  • works budgets
  • closes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 177Materials engineer27%
  2. 178Renewables engineer27%
  3. 179Traffic engineer27%
  4. 181Textile engineer27%
  5. 182Immunologist27%
  6. 183Schools inspector27%