IS WORK OVER?

Automation index

How much of a Hydraulic engineer’s job can AI already do?

A floodplain model comes earlier. Sizing the channel so the village does not flood do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Hydraulic engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Hydrology, flows and the floodplain model.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Field, section and what LiDAR misses.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Drainage works, pumps and the outfall.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Water permits and the river authority.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The flood, the village and the yes to the channel.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it does not flood, and not trusting the model alone.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • model floodplains
  • flows
  • drainage
  • channel works
  • water permits
  • pumps
  • channel sections
  • river authority

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Executive chef

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Menus, dish sheets and food cost.
Estimate

No public source provides a precise figure. This is our estimate.

18%38%+6.8
Orders, suppliers and waste.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Pass, plating and service pace.
Estimate

No public source provides a precise figure. This is our estimate.

20%10%+2
Lead the brigade, shifts and conflicts.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Cook on the line and correct doneness.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Hygiene, audits and the house’s name.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • cook
  • mise en place
  • dishes
  • bake
  • Menus, dish sheets and food cost
  • Orders, suppliers and waste
  • Pass, plating and service pace
  • Lead the brigade, shifts and conflicts
  • Cook on the line and correct doneness
  • Hygiene, audits and the house’s name

Sources for this job· O*NET 35-1011.00· ESCO/ISCO 3434

Analyse my job

Jobs with similar scores

  1. 161Packaging engineer27%
  2. 162Materials engineer27%
  3. 163Renewables engineer27%
  4. 165Textile engineer27%
  5. 166Key account manager27%
  6. 167Linguist27%