Automation index
How much of a Hydraulic engineer’s job can AI already do?
A floodplain model comes earlier. Sizing the channel so the village does not flood do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Hydraulic engineer
27%
AI can already do 27% of this job.
#164 / 633
View rankingHydraulic engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Hydrology, flows and the floodplain model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Field, section and what LiDAR misses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Drainage works, pumps and the outfall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Water permits and the river authority.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The flood, the village and the yes to the channel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it does not flood, and not trusting the model alone.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- model floodplains
- flows
- drainage
- channel works
- water permits
- pumps
- channel sections
- river authority
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142
IS WORK OVER?
Flight attendant
16%
#614 / 633
View rankingFlight attendant
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Briefing, cabin inventory and flight reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 30% | +4.8 |
Cabin service, sales and requests.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 22% | +4 |
Safety, demo and emergency procedure.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 8% | +1.6 |
Conflict and disruptive-passenger handling.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Care for minors, sick passengers and reduced mobility.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Coordination with cockpit and ground.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
| Total | 100% | 16% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Cabin service, sales and requests
- Safety, demo and emergency procedure
- Conflict and disruptive-passenger handling
- Coordination with cockpit and ground
- azafata
- auxiliar de vuelo
- tripulante de cabina
- flight attendant
- tcp
Sources for this job· O*NET 53-2031.00· ESCO/ISCO 5111