Automation index
How much of a Hydraulic engineer’s job can AI already do?
A floodplain model comes earlier. Sizing the channel so the village does not flood do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Hydraulic engineer
27%
AI can already do 27% of this job.
#164 / 623
View rankingHydraulic engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Hydrology, flows and the floodplain model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Field, section and what LiDAR misses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Drainage works, pumps and the outfall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Water permits and the river authority.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The flood, the village and the yes to the channel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it does not flood, and not trusting the model alone.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- model floodplains
- flows
- drainage
- channel works
- water permits
- pumps
- channel sections
- river authority
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142
IS WORK OVER?
Lift technician
20%
#463 / 623
View rankingLift technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diagnosis, codes and the lift history.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Shaft, pit and the cabin rescue.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Service, tensioning and the industry report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Modernise, doors and the limit switch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The residents, the porter and the night fault.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Get the person out, and sign the service.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- cabin rescue
- service lifts
- tension cables
- fault codes
- shaft pit
- cabin doors
- industry report
- modernise lifts
Sources for this job· O*NET 47-4021.00· ESCO/ISCO 7412