Automation index
How much of a Hydraulic engineer’s job can AI already do?
A floodplain model comes earlier. Sizing the channel so the village does not flood do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Hydraulic engineer
27%
AI can already do 27% of this job.
#164 / 623
View rankingHydraulic engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Hydrology, flows and the floodplain model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Field, section and what LiDAR misses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Drainage works, pumps and the outfall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Water permits and the river authority.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The flood, the village and the yes to the channel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it does not flood, and not trusting the model alone.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- model floodplains
- flows
- drainage
- channel works
- water permits
- pumps
- channel sections
- river authority
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142
IS WORK OVER?
Logistics analyst
28%
#79 / 623
View rankingLogistics analyst
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Costs, OTIF and the dashboard.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Simulate network, warehouses and the what-if.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Ops, dirty data and going down to the dock.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Report, the board and the cut that hurts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The haulier, the contract and not breaking the service.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
A real saving, and not dressing OTIF.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- logistics costs
- OTIF
- simulate network
- what-if
- dirty data
- haulage contracts
- dashboards
- network cuts
Sources for this job· O*NET 13-1081.00· ESCO/ISCO 2421