Automation index
How much of a Hydraulic engineer’s job can AI already do?
A floodplain model comes earlier. Sizing the channel so the village does not flood do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Hydraulic engineer
27%
AI can already do 27% of this job.
#164 / 633
View rankingHydraulic engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Hydrology, flows and the floodplain model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Field, section and what LiDAR misses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Drainage works, pumps and the outfall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Water permits and the river authority.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The flood, the village and the yes to the channel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it does not flood, and not trusting the model alone.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- model floodplains
- flows
- drainage
- channel works
- water permits
- pumps
- channel sections
- river authority
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142
IS WORK OVER?
Nursery grower
22%
#402 / 633
View rankingNursery grower
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Sow, water and the calendar.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Glasshouse, pest and the batch that turns.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Order, the garden centre and the plant that is not ready.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Substrate, feed and the one that drowns.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The heat, the shade and not selling too early.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Saleable, and not drowning the rootball.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- nursery sowing
- glasshouse
- rootball
- plant pests
- garden centre
- substrate
- watering calendar
- shade
Sources for this job· O*NET 45-2092.00· ESCO/ISCO 6113