Automation index
How much of a Hydraulic engineer’s job can AI already do?
A floodplain model comes earlier. Sizing the channel so the village does not flood do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Hydraulic engineer
27%
AI can already do 27% of this job.
#164 / 633
View rankingHydraulic engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Hydrology, flows and the floodplain model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Field, section and what LiDAR misses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Drainage works, pumps and the outfall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Water permits and the river authority.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The flood, the village and the yes to the channel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it does not flood, and not trusting the model alone.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- model floodplains
- flows
- drainage
- channel works
- water permits
- pumps
- channel sections
- river authority
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142
IS WORK OVER?
Osteopath
20%
#460 / 633
View rankingOsteopath
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
History, tests and a first plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Manipulation, mobilisation and visceral work.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Explain, dose and refer if there is a red flag.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Clinical notes and progress.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Room, hygiene and informed consent.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
The practitioner’s body and not doing harm.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- History, tests and a first plan
- Clinical notes and progress
- Room, hygiene and informed consent
- The practitioner’s body and not doing harm
- osteopata
- osteopath
Sources for this job· O*NET 29-1299.00· ESCO/ISCO 2269