IS WORK OVER?

Automation index

How much of a Hydraulic engineer’s job can AI already do?

A floodplain model comes earlier. Sizing the channel so the village does not flood do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Hydraulic engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Hydrology, flows and the floodplain model.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Field, section and what LiDAR misses.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Drainage works, pumps and the outfall.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Water permits and the river authority.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The flood, the village and the yes to the channel.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it does not flood, and not trusting the model alone.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • model floodplains
  • flows
  • drainage
  • channel works
  • water permits
  • pumps
  • channel sections
  • river authority

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Piling operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, level and each pile’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive, bore and refusal.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Cage, pour and the tube that rides up.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Vibration, the neighbour and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Plant, access and the one that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
To level, and not cracking party walls.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive piles
  • bore
  • cages
  • refusal level
  • site vibration
  • pour piles
  • piling set-out
  • recoverable tubes

Sources for this job· O*NET 47-2073.00· ESCO/ISCO 7114

Analyse my job

Jobs with similar scores

  1. 161Packaging engineer27%
  2. 162Materials engineer27%
  3. 163Renewables engineer27%
  4. 165Textile engineer27%
  5. 166Key account manager27%
  6. 167Linguist27%