Automation index
How much of a Hydraulic engineer’s job can AI already do?
A floodplain model comes earlier. Sizing the channel so the village does not flood do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Hydraulic engineer
27%
AI can already do 27% of this job.
#164 / 623
View rankingHydraulic engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Hydrology, flows and the floodplain model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Field, section and what LiDAR misses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Drainage works, pumps and the outfall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Water permits and the river authority.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The flood, the village and the yes to the channel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it does not flood, and not trusting the model alone.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- model floodplains
- flows
- drainage
- channel works
- water permits
- pumps
- channel sections
- river authority
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142
IS WORK OVER?
Weaver
19%
#532 / 623
View rankingWeaver
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Warp, weave and the width.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Weave, shuttle and the yarn that snaps.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Finish, fringe and the shrink.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Loom, the rhythm and the commissioned piece.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the colour and not changing the warp halfway.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Without breaking the pick, and a clean weave.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- warp
- weaves
- shuttle
- looms
- fringe
- the pick
- cloth width
- shrink
Sources for this job· O*NET 51-6062.00· ESCO/ISCO 7318